Snag List
Every snag has a photo, an owner and a deadline.
One list of every open issue across the site. Each snag carries the photo, the exact location, the person responsible and the due date. It only closes when a closure photo is attached and the inspector accepts it.
In the app
What your team sees on site.
- Raise a snag from a checklist, an AI flag or a quick photo in under ten seconds
- Assign it to a subcontractor with a due date they see on their own phone
- Overdue snags escalate on a schedule you set, from engineer to project manager
- Closure needs a new photo and acceptance by the person who raised it
| Snag | Owner | Due | Proof | Status |
|---|---|---|---|---|
Rebar cover blocks missing SN-1184 · Beam B2-B3 · L4 · Major | Steel fixing contractor | 15 Oct | Open | |
Honeycombing on column C5 SN-1183 · Column C5 · L4 · Major | Concrete contractor | 17 Oct | Open | |
Edge protection missing SN-1182 · Grid C4-C6 · L4 · Critical | Shuttering subcontractor | 14 Oct | Closed | |
Plaster hollow sound on wall SN-1176 · Flat 302 · L3 · Minor | Finishing contractor | 11 Oct | Overdue Escalated to project manager | |
Waterproofing lap not sealed SN-1169 · Terrace · Tower A · Major | Waterproofing vendor | 09 Oct | Overdue Escalated to project manager | |
Door frame out of plumb SN-1158 · Flat 204 · L2 · Minor | Carpentry contractor | 08 Oct | Closed |
10 s
to raise a snag with photo and location
2 photos
on every closed snag, before and after
4 levels
of escalation for overdue items
Capabilities
Built for how sites actually run.
01
Pin to the drawing
Drop the snag on the floor plan so anyone can walk straight to it. Grid and room references are added automatically.
02
Subcontractor access
Subcontractors see only their own snags. They can upload a fix photo, but the inspector decides when it closes.
03
Escalation ladder
Set how many days overdue before a snag moves to the next level. Critical safety snags escalate in hours.
04
Before and after
The original and closure photos sit side by side in the snag record and in every report.
05
Bulk walk mode
Raise a run of snags on a handover walk without leaving the camera, then assign them in one go.
06
Searchable history
Filter by tower, floor, trade, contractor, severity or age to see where problems keep repeating.
How it runs
Four steps, every time.
- 1
Spotted
Raised from a checklist fail, an AI flag or a direct photo.
- 2
Assigned
An owner and a due date are set. The owner is notified.
- 3
Fixed
The owner uploads a fix photo from site.
Closed
The inspector accepts the closure photo. The snag turns green.
Next stop on the walk
Handover · all markups closed
Every circle
drawn in red
ends in green.
Write down three sites you are running right now. We set them up with checklists, the snag list and the AI Defect Spotter, and you walk them free.
- All modules included
- No card to start
- Site app works offline