Skip to content
Consteng

Quality

Snag List

Every snag has a photo, an owner and a deadline.

One list of every open issue across the site. Each snag carries the photo, the exact location, the person responsible and the due date. It only closes when a closure photo is attached and the inspector accepts it.

ConstengNO ENTRY WITHOUTHELMET AND SHOESEdge protection missingSLAB EDGE · GRID C4-C6 · SAFETY · CRITICALNo harness near openingGRID B3 · SAFETY · CRITICAL3Honeycombing on C5COLUMN SURFACE · QUALITY · MAJOR4Cover blocks missingBEAM B2-B3 · QUALITY · MAJORCLOSED · VERIFIEDCLOSURE PHOTO 11:58 · SAFETY OFFICER
Four snags raised on one walk, two closed with proofTower B · Level 4 · 14 Oct 2026

In the app

What your team sees on site.

  • Raise a snag from a checklist, an AI flag or a quick photo in under ten seconds
  • Assign it to a subcontractor with a due date they see on their own phone
  • Overdue snags escalate on a schedule you set, from engineer to project manager
  • Closure needs a new photo and acceptance by the person who raised it
Snag List · Tower B · Residential, 14 floors
SnagOwnerDueProofStatus

Rebar cover blocks missing

SN-1184 · Beam B2-B3 · L4 · Major

Steel fixing contractor15 Oct
Open

Honeycombing on column C5

SN-1183 · Column C5 · L4 · Major

Concrete contractor17 Oct
Open

Edge protection missing

SN-1182 · Grid C4-C6 · L4 · Critical

Shuttering subcontractor14 Oct
Closed

Plaster hollow sound on wall

SN-1176 · Flat 302 · L3 · Minor

Finishing contractor11 Oct
Overdue

Escalated to project manager

Waterproofing lap not sealed

SN-1169 · Terrace · Tower A · Major

Waterproofing vendor09 Oct
Overdue

Escalated to project manager

Door frame out of plumb

SN-1158 · Flat 204 · L2 · Minor

Carpentry contractor08 Oct
Closed

10 s

to raise a snag with photo and location

2 photos

on every closed snag, before and after

4 levels

of escalation for overdue items

Capabilities

Built for how sites actually run.

01

Pin to the drawing

Drop the snag on the floor plan so anyone can walk straight to it. Grid and room references are added automatically.

02

Subcontractor access

Subcontractors see only their own snags. They can upload a fix photo, but the inspector decides when it closes.

03

Escalation ladder

Set how many days overdue before a snag moves to the next level. Critical safety snags escalate in hours.

04

Before and after

The original and closure photos sit side by side in the snag record and in every report.

05

Bulk walk mode

Raise a run of snags on a handover walk without leaving the camera, then assign them in one go.

06

Searchable history

Filter by tower, floor, trade, contractor, severity or age to see where problems keep repeating.

How it runs

Four steps, every time.

  1. 1

    Spotted

    Raised from a checklist fail, an AI flag or a direct photo.

  2. 2

    Assigned

    An owner and a due date are set. The owner is notified.

  3. 3

    Fixed

    The owner uploads a fix photo from site.

  4. Closed

    The inspector accepts the closure photo. The snag turns green.

Handover · all markups closed

Every circle
drawn in red
ends in green.

Write down three sites you are running right now. We set them up with checklists, the snag list and the AI Defect Spotter, and you walk them free.

  • All modules included
  • No card to start
  • Site app works offline

Inspect 3 sites free

Handover tag · fill in and tear off

Login details arrive by email after signup.