Quality
Inspection Checklists
Every stage checked before it gets covered.
Stage-wise quality and safety checklists that site engineers complete on a phone. Each answer carries a photo, the grid location and the time, so a pour is released on evidence and not on a phone call.
In the app
What your team sees on site.
- Excavation, foundation, shuttering, reinforcement, concreting and finishing checklists ready to use
- Pass, fail or not applicable on each line, with a photo required on every fail
- A failed line raises a snag and can hold the pour until it is cleared
- Works offline on site and syncs when the phone finds a signal
Stage 4 · Reinforcement
Beam B2-B3 · Level 4 · Tower B
Bar diameter and count as per drawing
S-204 Rev CLap length at 50d, staggered
IS 456 cl. 26.2.5Stirrup spacing at 150 c/c near supports
S-204Cover blocks at 1 m spacing, 25 mm cover
IS 456 cl. 26.4Snag raised · photo attachedGrid B2-B3 · 10:41 · to steel fixerFormwork cleaned, no debris inside
QAP 7.3Electrical conduits fixed before pour
MEP sign-off
Location and time stamped · saved offline
6
construction stages covered out of the box
1 tap
to turn a failed line into a snag
0 bars
of signal needed to complete a checklist
Capabilities
Built for how sites actually run.
01
Stage templates
Start from checklists built around common pour cards and quality assurance plans, then edit lines, references and tolerances to match your specification.
02
Hold points
Mark any line as a hold point. The stage cannot be released until that line passes and the right engineer signs it.
03
Photo on fail
A fail cannot be saved without a photo. The photo is stamped with the time, the floor and the grid reference.
04
Offline first
Basements, cores and upper floors rarely have signal. Checklists save on the phone and sync in the background.
05
Sign-off chain
Site engineer, quality engineer and consultant sign in order, each with their own login and time stamp.
06
Pour cards
Completed reinforcement and shuttering checklists become a pour card that the concreting team can see on their phones.
How it runs
Four steps, every time.
- 1
Pick the stage
Choose the tower, floor and element. The right checklist loads for that stage.
- 2
Walk and mark
Mark each line pass, fail or not applicable, adding photos as you go.
- 3
Fails become snags
Every fail opens a snag with an owner and a due date.
Release or hold
Hold points block release until they pass and are signed.
Next stop on the walk
Handover · all markups closed
Every circle
drawn in red
ends in green.
Write down three sites you are running right now. We set them up with checklists, the snag list and the AI Defect Spotter, and you walk them free.
- All modules included
- No card to start
- Site app works offline